Estimating Electricity Generation from Wind Power by V82 at ThiQar – Iraq

Main Article Content

Auday H. Shaban

Abstract

One of the most demanded studies is wind turbine site assessment. It is difficult to build a simulation program because of the many variables that affect the wind speed and direction. The procedure of this research depend on two approaches, the Wind Atlas Analysis model and the Inverse Distance Wait interpolation. These procedures give the estimated annual energy production for each turbine (V82) with 82m blades diameter at 70m hub heights. The output at this location for each turbine is about (4.3 GWh). The studied area is about 20x20km2 and could be plant at least 600 turbine and have about 2500 GWh of annual energy production.

Article Details

How to Cite
Estimating Electricity Generation from Wind Power by V82 at ThiQar – Iraq. (2017). Ibn AL-Haitham Journal For Pure and Applied Sciences, 29(2), 60-69. https://jih.uobaghdad.edu.iq/index.php/j/article/view/85
Section
Physics

How to Cite

Estimating Electricity Generation from Wind Power by V82 at ThiQar – Iraq. (2017). Ibn AL-Haitham Journal For Pure and Applied Sciences, 29(2), 60-69. https://jih.uobaghdad.edu.iq/index.php/j/article/view/85

Publication Dates